Equipment and pressure vessels
is designing, manufacturing and installing heavy equipment, columns, reactors and pressure vessels - also on-site construction - which can no longer be made in a workshop and no longer be transported in one piece to site due to their dimensions.
The tanks are designed and constructed by our engineers in accordance with the relevant regulations e.g. AD2000, HP0, PED etc.. The required approvals and the mounting equipment for the safe execution of these works are available. There is extensive experience in logistics and handling (e.g. creation of lifting studies) of large and heavy pre-fabricated plant components.